BOILERAuxiliary boiler tube bundle renewal
12 t/h composite boiler • Tuzla workshop
The full tube bundle was removed, wall thickness surveyed and new tubes fitted with TIG welding. The boiler passed a hydrostatic test at 1.5x working pressure and was handed over in the presence of the class surveyor.
















