// Project Gallery

Completed Projects

Real work from our workshop and from vessels — short case studies from boiler, heat exchanger, IGG, BWTS and hull projects.

Auxiliary boiler tube bundle renewal
BOILER

Auxiliary boiler tube bundle renewal

12 t/h composite boiler • Tuzla workshop

The full tube bundle was removed, wall thickness surveyed and new tubes fitted with TIG welding. The boiler passed a hydrostatic test at 1.5x working pressure and was handed over in the presence of the class surveyor.

NK Class approvedHydrostatic test48 hours
Plate heat exchanger gasket renewal
PLATE

Plate heat exchanger gasket renewal

Lube oil cooler • Workshop service

Plates were stripped and ultrasonically cleaned, deformed plates replaced and the pack reassembled with original gaskets. The tightening dimension was set to manufacturer tolerances.

Original gasketsUltrasonic cleaningTightness test
Scavenge air cooler tube bundle manufacture
SCAVENGE

Scavenge air cooler tube bundle manufacture

Main engine • Workshop fabrication

The finned tube bundle was re-manufactured in the workshop and pressure-tested on both air and water sides. Fitted with a new gasket set and shipped to the vessel the same day.

Finned tube productionTwo-side pressure testSame-day dispatch
IGG combustion chamber manufacture & refractory renewal
IGG

IGG combustion chamber manufacture & refractory renewal

Inert gas generator • Tanker

Combustion chamber refractory was removed, the shell renewed and castable lining applied. Burner and gas path were cleaned, the O2 analyser calibrated and commissioning completed.

Chamber manufactureO2 calibrationCommissioning
Ballast water treatment system installation
BWTS

Ballast water treatment system installation

Pump room • Installation & commissioning

The system module was placed in the pump room and piping and flange connections completed. Commissioning tests were reported together with flow and TRO measurements.

IMO D-2 complianceFlow & TRO measurementTest report
Scrubber tower fabrication & erection
SCRUBBER

Scrubber tower fabrication & erection

Exhaust gas scrubber • Shipyard

The scrubber tower shell, circulation line and nozzle manifold were fabricated in the workshop and erected onboard. pH and flow sensors were calibrated and washwater analysed.

Custom fabricationNozzle manifoldpH / flow calibration
Incinerator castable lining application
REFRACTORY

Incinerator castable lining application

Waste incinerator • Confined space

Castable lining was applied inside the incinerator chamber; anchors were renewed and the curing programme followed the manufacturer's instructions. Lining thickness and crack inspection were reported.

Castable liningAnchor renewalCuring programme
Generator engine overhaul
ENGINE

Generator engine overhaul

Auxiliary generator • Onboard

The generator engine was fully stripped and overhauled; cylinder heads, injectors and bearings were inspected. It was returned to service after load testing and oil analysis.

Full overhaulLoad testOil analysis
Ship hull plate renewal
HULL

Ship hull plate renewal

340 m² plating • Dry dock

340 m² of plating was renewed in dry dock, with cutting and welding carried out to class-approved procedures. Handed over after ultrasonic inspection and coating.

Class-approved weldingUltrasonic inspectionDry dock
Safety valve testing & certification
VALVE

Safety valve testing & certification

Boiler safety valves • Workshop testing

Safety valves were removed and bench-tested for set pressure and tightness. Certified test reports were issued after calibration.

Set pressure testCalibrationCertified report
Box cooler tube bundle renewal
BOX COOLER

Box cooler tube bundle renewal

Sea water circuit • Workshop

The box cooler tube bundle was renewed, shell corrosion cleaned and gaskets replaced. Sea water side pressure testing was completed after assembly.

Tube bundle renewalCorrosion cleaningPressure testing
Custom pressure vessel fabrication
PRESSURE VESSEL

Custom pressure vessel fabrication

Hot water tank • Class certified

A custom-sized pressure vessel was fabricated; class certification was issued after WPS/PQR approved welding and hydrostatic testing. Material certificates were filed.

WPS/PQR weldingHydrostatic testClass certificate

Planning a similar job?

Share your vessel type, IMO number and the service you need; our technical team will come back with a scope and timeline.

Get a Quote
    base44